First use

The first use of the tower backup energy storage battery is a key link to ensure the safe and efficient operation of the equipment. The correct initial operation activates battery performance while eliminating potential risks and laying the foundation for subsequent operations.

First use

The first use of the tower backup energy storage battery needs to be carried out step by step from equipment inspection, system initialization to operation debugging to ensure that the battery is in good working condition. Through proper initialization and testing, you can effectively activate battery performance, extend device life, and avoid early failures, laying a solid foundation for subsequent operation.

Specific steps and precautions

Equipment inspection

Appearance inspection: Check whether the battery shell is intact, without damage, cracks or other physical damage; Ports and connectors are free from corrosion or loosening.
Cable connection check: Verify that all electrical connections are correct, including the accuracy of the positive and negative terminals, whether the ground cable is secure, and whether the cable insulation is intact.
Fixed and supported: Ensure that the device is firmly installed on the foundation support and has a seismic design in place to avoid shaking or displacement during operation.

System initialization

Check before power on: Before power on, ensure that all switches are off, and ensure that the environment meets the requirements for device operation (such as temperature, humidity, and ventilation).
Initial setting: Set basic parameters of the energy storage system according to the operation manual, including battery capacity, voltage range, charge and discharge current limit, and protection threshold.
Communication configuration: Complete the communication Settings between the energy storage battery and the monitoring device to ensure that the system can upload the operating status and receive instructions.

Operation debugging

Power on self-test: After power on, start the device self-test function to check whether all modules are running normally and whether there are error codes or abnormal alarms in the system.
Initial charge: It is usually necessary to fully charge the battery for the first time to activate battery performance and ensure consistent voltage across all individual batteries. Operate according to the manufacturer's recommended current and voltage ranges.
Functional test: test discharge after charging, observe the operating performance and parameter fluctuations of the battery pack, confirm whether it is within a reasonable range, and test whether the protection function is effective (such as overcharge or overdischarge protection).

TOWER BACKUP BATTERY

With its integrated structural design, intelligent BMS monitoring, and standardized cabinet installation, ESS 48V series lithium iron phosphate batteries can provide reliable backup power for access network equipment, remote exchange, mobile communication, transportation equipment, emergency power and other systems.

Extended reading

User guide

User guide The use guide for tower backup energy storage...

Core component

Core component The performance and stability of tower backup energy...

Design advantage

Design advantage The design advantages of tower backup energy storage...

Application scenario

Application scenario The application scenario of tower backup energy storage...

THE ESSC Brand promise

Global supply

Our products sell well all over the world, covering many countries and regions, through the global logistics network, to provide customers with convenient purchasing experience.

Rigorous quality

We adhere to the highest quality control standards to ensure every product meets industry regulations and customer expectations, earning trust through consistent excellence.

Excellent service

With a customer-centric approach, we provide prompt responses, professional support, and personalized services, aiming to deliver the best user experience and long-term value.

QUICK INQUIRY

Please enable JavaScript in your browser to complete this form.
Name